Wind · ARK Energy Corporation Pty Ltd · Wind Turbine - Onshore
03 Jun 2026 22:35 → 04 Jun 2026 22:35 AEST
| Capex total (greenfield) |
$600.64M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,732,760
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$20.11M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Stage 1 of Bowmans Creek Wind Farm was approved in February 2024 and described by Ark Energy as a $569 million project for 54 turbines and 347 MW. The per-MW capex is calculated from the reported total cost and the site capacity provided (346.64 MW). No project-specific O&M benchmark was found in the searched sources, so fallback default O&M was used for fixed and variable values.