BESS · Bouldercombe North BESS Pty Ltd · Storage - Battery
03 Jun 2026 18:00 → 04 Jun 2026 18:00 AEST
| Capex total (greenfield) |
$163.93M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$102,459
Shown in table |
| Fixed OPEX (annual) |
$10.25M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$25,615
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific capex/thermal performance/efficiency/heat-rate found for this generator. Fixed and variable OPEX and emissions intensity populated from provided internal defaults; capex left as null because a battery benchmark CAPEX value (AUD/MW and nominal year) could not be reliably extracted from the available AEMO/CSIRO battery cost review content within this run.