BESS · Barathrum Energy Pty Ltd · Storage - Battery
15 Jun 2026 00:00 → 15 Jun 2026 08:45 AEST
| Capex total (greenfield) |
$81.22M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.33M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$18,987
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.21
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement or official project cost could be located in searched sources. AEMO/CSIRO benchmark sources were located for utility-scale solar PV and BESS assumptions, but no verified Bonnie Brae Hybrid Plant investment figure was found. Given the site is a hybrid battery + solar project, the provided normalised type is solar_fixed only as a fallback label; financial assumptions should be reviewed if project-specific documentation becomes available.