Bonnie Brae Hybrid Plant

BESS · Barathrum Energy Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
70/260 MW
Researched capacity / storage
Est. SRMC
$0.21/MWh
Key information
Capacity (AI)
70 MW / 260 MWh

AEMO spreadsheet entry for Bonnie Brae Hybrid Plant (publicly announced) lists 70.00 MW and 260.00 MWh; no better public capacity source was found in the provided results.

AEMO status Publicly Announced
Project status Development (AI)

No public project page, owner announcement, or planning document was found in the provided search results; the asset is still listed as publicly announced rather than built or operating.

Coordinates

DUID
Owner Barathrum Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 Jun 2026 04:00 → 15 Jun 2026 04:00 AEST

Dispatch & revenue

14 Jun 2026 04:00 → 15 Jun 2026 04:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
70 MW / 260 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.21/MWh
Capex total (greenfield)
$81.22M

Shown in table
$81.22M (2026 real AUD)

Reported / source value
$77.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.33M

Shown in table
$1.33M (2026 real AUD)

Reported / source value
$1.26M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$18,987

Shown in table
$19.0k (2026 real AUD)

Reported / source value
$18.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No directly extractable AEMO line for solar PV fixed O&M was retrieved in the search session, so the internal fallback value is retained as an unverified placeholder.

Variable OPEX / MWh
$0.21

Shown in table
$0.21 (2026 real AUD)

Reported / source value
$0.20 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M was found; this remains a server-side fallback.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex announcement or official project cost could be located in searched sources. AEMO/CSIRO benchmark sources were located for utility-scale solar PV and BESS assumptions, but no verified Bonnie Brae Hybrid Plant investment figure was found. Given the site is a hybrid battery + solar project, the provided normalised type is solar_fixed only as a fallback label; financial assumptions should be reviewed if project-specific documentation becomes available.

Sources