BESS · Hanwha Energy Australia Pty Ltd · Storage - Battery
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$6.86M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement could be verified from owner/developer/government sources in web search. The site appears to be a publicly announced Hanwha Energy Australia battery project at 260 MW, with Boiling Down BESS Pty Ltd described as an entity supporting modifications to the Gregadoo Solar Farm project site to incorporate a 200 MW battery in Hanwha's FY24 modern slavery statement; however, this does not provide a project cost. O&M and other operating assumptions use the provided internal fallback defaults. Fixed OPEX annual is calculated as 25,000 AUD/MW-yr × 260 MW = 6,500,000 AUD/yr.