BESS · Photon Energy · Storage - Battery
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,285,047
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh default |
$0.20
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield construction cost was located in the searched owner/developer, government, or market sources. Photon Energy disclosed acquisition of development rights and land for a 9.8 MWp/10 MWh Boggabri solar-plus-storage project in Nov 2022, but the price was undisclosed. The project appears to have been sold later as a development-stage asset, which further limits use of any inferred capex as project construction cost. Solar PV and BESS operating/capital benchmarks from AEMO/CSIRO were found, but per instructions were not used as reported plant-specific capex. Tech assumption fields left blank rather than backfilled from benchmarks because the user asked for a solar-fixed normalised type and the site is storage-plus-solar, but there is no verified plant-specific O&M or capex from the sources found.