Wind · South Pacific Power Pty Ltd · Wind Turbine - Onshore
03 Jun 2026 18:30 → 04 Jun 2026 18:30 AEST
| Capex total (greenfield) |
$184.49M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$4.61M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
Web search did not reliably return plant-specific commissioning date or greenfield CAPEX for BOCOROC2, nor any brownfield upgrade spend. O&M defaults were retained due to missing AEMO wind-onshore retirement/O&M estimate review alignment with the required cost base-year/currency basis for this specific DUID; please re-run with AEMO GenCost/ETC ‘onshore wind’ CAPEX and O&M for the latest published review tables.