BESS · Ms BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust · Storage - Battery
13 Jun 2026 08:25 → 14 Jun 2026 08:25 AEST
| Capex total (greenfield) |
$438.61M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$902,485
Shown in table |
| Fixed OPEX (annual) |
$7.18M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$18,987
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.21
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
Project is development-stage (no clear commissioning date found in sources searched). AEMO/CSIRO ETC review provides battery CAPEX/OPEX benchmarks for co-located BESS; however mapping to this exact plant’s solar+storage configuration and splitting per-MW storage basis requires additional confirmation. Used provided internal defaults where AEMO benchmark values could not be reliably extracted for this technology+duration basis for the requested fields.