13 Jun 2026 15:20 → 14 Jun 2026 15:20 AEST
| Capex total (greenfield) |
$232.06M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh default |
$0.20
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
I could not locate a reliable plant-specific greenfield capital cost announcement for the Blackwater Hybrid System from the owner/developer or government sources. Search results returned only unrelated Blackwater mine/project documents and a registry listing confirming the asset identity and operating date. Because no defensible project-specific capex was found, I have left capex fields null rather than substituting a benchmark. The generator appears to be registered as a solar PV hybrid asset with full commercial use date 2029-06-01 in the registry source, but no financial disclosures were identified.