12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST
| Capex total (greenfield) |
$42.19M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$2.64M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex or operating cost disclosures were found in the searched sources. Internal server-side fallback defaults were used for capex_per_mw_aud, fixed and variable OPEX, and emissions intensity. Capacity is 100 MW, so fallback fixed OPEX annualised to AUD 2.5 million/year. Storage duration, commissioning date, and project cost remain unverified.