Blackstone BESS

BESS · FIrm Power P/L · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
331/500 MW
Registered nameplate capacity / storage
Est. SRMC
$1.50/MWh
Key information
Capacity
331 MW / 500 MWh
AEMO status Publicly Announced
Project status Development (AI)

DUID
Owner FIrm Power P/L
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
03 Jun 2026 17:55 → 04 Jun 2026 17:55 AEST

Dispatch & revenue

03 Jun 2026 17:55 → 04 Jun 2026 17:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
331 MW / 500 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield) default
$175.00M

Shown in table
$175.00M (2026 real AUD)

How this was derived
No source-backed capex information available for Blackstone BESS from the provided search results.

Capex refurbishment
Capex / MWh storage default
$350,000

Shown in table
$350.0k (2026 real AUD)

Fixed OPEX (annual)

How this was derived
No source-backed fixed O&M information available for Blackstone BESS from the provided search results.

Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

How this was derived
No source-backed variable O&M information available for Blackstone BESS from the provided search results.

Fuel cost / GJ

How this was derived
Battery storage has no fuel cost, but no generator-specific fuel contract or operating arrangement was source-backed from the provided search results.

Heat rate GJ/MWh

Confidence: unknown · Status: ai estimated · Capex basis: unknown · AI checked 04 Jun 2026

Notes
No web search results were returned for this specific generator, so generator-specific financial or operating assumptions could not be source-verified. Emissions intensity is set to 0 for battery storage as a technology default, but this was not source-verified for the specific asset. No capex, O&M, fuel, efficiency, asset life, or refurbishment/closure information was found in the provided search results.

Sources

  • capex_total_aud (low)
  • emissions_intensity_tco2_mwh (low)
  • fixed_opex_annual_aud (low)
  • fuel_cost_per_gj_aud (low)
  • variable_opex_per_mwh_aud (low)