14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$73.84M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
I found official owner material confirming Beryl Energy Storage Project is 100 MW / 200 MWh and expected to commence operation in 2029, but I did not find a plant-specific greenfield total project cost announcement. Because no project-specific capex figure was located, capex remains unset rather than defaulted. For BESS, fuel cost and heat rate are not applicable. Emissions intensity is set to zero for battery storage.