Bennetts Creek BESS

BESS · Bennetts Creek Energy Project Pty Ltd in its capacity as Trustee for the Bennetts Creek Energy Project Trust · Storage - Battery

Development AEMO: Anticipated Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Anticipated
Project status Development (AI)

No web results returned for Bennetts Creek BESS; project phase inferred from AEMO status 'Publicly Announced' and absence of evidence of construction/commissioning.

Coordinates

DUID
Owner Bennetts Creek Energy Project Pty Ltd in its capacity as Trustee for the Bennetts Creek Energy Project Trust
Commissioned Jul 2027
Expected closure 2047
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
13 Jun 2026 02:20 → 14 Jun 2026 02:20 AEST

Dispatch & revenue

13 Jun 2026 02:20 → 14 Jun 2026 02:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$150.00M

Shown in table
$150.00M (2026 real AUD)

How this was derived
Third-party project reporting identifies Bennetts Creek as a $150m Gippsland battery project. Used as the generator-specific capex value because official financing disclosures did not state a value.

Reference
Funding secured and two major contracts signed for $150m Gippsland battery project, with construction to commence this year (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MWh storage
$750,000

Shown in table
$750.0k (2026 real AUD)

Fixed OPEX (annual)
$1.33M

Shown in table
$1.33M (2026 real AUD)

How this was derived
Aurecon's 200 MW 2-hour BESS O&M with warranty is AUD 2.66m/year; scaled linearly to 100 MW gives AUD 1.33m/year.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$13,300

Shown in table
$13.3k (2026 real AUD)

How this was derived
Default O&M assumption for a 2-hour large-scale BESS. Scaled to Bennetts Creek's 100 MW as AUD 1.33m/year.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

How this was derived
Variable O&M is not modelled as a separate reported cost for BESS in the Aurecon technology review, so the field is left null rather than assuming a numeric value.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

How this was derived
Aurecon treats batteries using charge/discharge efficiency parameters rather than heat-rate parameters.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
No web search results were returned for this specific generator, so no generator-specific financial or operating assumptions could be source-verified. For a battery storage asset, fuel cost, heat rate, and direct emissions intensity are generally not applicable; emissions intensity is set to 0 only as a technology default, not as a site-specific reported value. Major refurbishment or closure notes unavailable.

Latest AI note (4 Jun 2026)

Specific official capex and O&M figures were not found in Flow Power, Zenviron or Monadelphous disclosures. Capex uses a third-party Projectory report describing the project as a $150m Gippsland battery project; official Flow Power/Zenviron sources confirm financial close, scope, contractor roles and construction/commercial-operation timing but not the dollar value. Capex per MWh is calculated against the user-provided 200 MWh storage capacity; the latest official financial-close and contractor sources also state 100 MW / 223 MWh, which would imply about AUD 672,646/MWh. O&M, round-trip efficiency and asset life are technology default estimates from Aurecon's 2024 Energy Technology Cost and Technical Parameter Review for a 2-hour large-scale lithium-ion BESS, scaled to 100 MW. Fixed opex includes Aurecon's 2-hour BESS fixed O&M of AUD 8,000/MW-year plus indicative 20-year extended warranty of AUD 5,300/MW-year. Variable O&M is left null because Aurecon states BESS long-term service agreements are not typically based on fixed/variable splits. Direct operational emissions are treated as zero for battery storage; lifecycle and charging-energy emissions are market-dependent and not included. Closure/refurbishment: Aurecon indicates 20-year economic/design life, possible extension to about 25 years after condition assessment, and further life extension with battery upgrades; no Bennetts Creek-specific closure date was found. Current project timeline: planning permit Q4 2023, GPS approval Q1 2024, financial close Q4 2025, construction commences Q1 2026, commercial operation expected 2028.

Sources