Belhaven Renewable Project

BESS · Vena Energy Services (Australia) Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

DUID
Owner Vena Energy Services (Australia) Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
03 Jun 2026 19:25 → 04 Jun 2026 19:25 AEST

Dispatch & revenue

03 Jun 2026 19:25 → 04 Jun 2026 19:25 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$470.83M

Shown in table
$470.83M (2026 real AUD)

How this was derived
Aurecon/AEMO provides benchmark EPC costs for a 2-hour, 200 MW BESS. The value in this dataset scales those costs linearly to 408 MW / 816 MWh.

Reference
2024 Energy Technology Costs and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MWh storage
$577,000

Shown in table
$577.0k (2026 real AUD)

How this was derived
A 2-hour BESS has AUD 1.154 million/MW, equivalent to AUD 577,000/MWh.

Reference
2024 Energy Technology Costs and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$3.26M

Shown in table
$3.26M (2026 real AUD)

How this was derived
Scaled 2-hour benchmark fixed O&M from 200 MW to 408 MW.

Reference
2024 Energy Technology Costs and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$8,000

Shown in table
$8.0k (2026 real AUD)

How this was derived
Uses the 2-hour BESS column: AUD 8,000/MW-year.

Reference
2024 Energy Technology Costs and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
BESS has no fuel cost per GJ; market charging energy costs are not represented as a fuel contract in the available sources.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh

How this was derived
Because the asset stores electricity rather than converting fuel heat to electricity, heat rate is not applicable.

Reference
2024 Energy Technology Costs and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
No specific financial data found for the Belhaven Renewable Project. Default estimates will be applied based on industry norms.

Latest AI note (4 Jun 2026)

Belhaven-specific reported total capex was not found beyond the NSW State Significant Development threshold that capital investment value exceeds AUD 30 million. The capex entered is an estimate using Aurecon/AEMO 2024 2-hour large-scale lithium-ion BESS EPC cost parameters with a dedicated grid connection, scaled to the user-provided 408 MW / 816 MWh configuration: AUD 526/kW power component plus AUD 314/kWh energy component = AUD 470.832 million. This is an EPC/construction-cost estimate and may exclude owner’s costs, financing, contingency beyond the benchmark, augmentation, and final procurement outcomes. Fixed O&M is from the same Aurecon/AEMO 2-hour BESS benchmark excluding extended battery warranties; adding the listed 20-year LFP extended warranty allowance of AUD 5,300/MW-year would increase annual fixed-like costs to about AUD 5.426 million/year. Variable O&M is treated as AUD 0/MWh because Aurecon reports no separate variable O&M for BESS and notes long-term service agreements are not typically split into fixed/variable. Efficiency is round-trip efficiency at beginning of life, not thermal efficiency. Direct operational emissions are assumed zero for battery discharge; lifecycle and charging-energy emissions are excluded. Vena’s current public Belhaven page states 400 MW and up to 3,985 MWh, while the 2023 scoping report states approximately 400 MW / 800 MWh and the user supplied 408 MW / 816 MWh; this discrepancy requires review before financial close modelling. Current Vena page states the project remains in development, DA expected Q2 2026 and construction anticipated Q2/Q3 2027 subject to approval; older 2023 scoping timing of 2025-2026 construction and 2026-2046 operation appears superseded.

View 3 earlier AI notes
4 Jun 2026

No project-specific full capex, O&M contract, OEM, financing, or DUID was found in public sources. The capex estimate is not reported Belhaven capex: it is derived from Aurecon/AEMO 2024 Energy Technology Cost and Technical Parameter Review values for a 2-hour, 200 MW large-scale lithium-ion BESS with dedicated grid connection, scaled linearly to the user-provided 408 MW / 816 MWh configuration. Formula used: AUD 526/kW power component x 408,000 kW + AUD 314/kWh energy component x 816,000 kWh + land/development AUD 10m x 408/200 = AUD 491.232m. Fixed O&M uses Aurecon 2-hour BESS fixed O&M AUD 8,000/MW-year plus 20-year extended warranty allowance AUD 5,300/MW-year = AUD 13,300/MW-year, scaled to 408 MW. Variable O&M is left null because Aurecon states BESS long-term service agreements are not typically based on fixed/variable O&M. Direct operational emissions intensity is set to 0 tCO2/MWh for the battery discharge asset only; lifecycle and charging-energy emissions depend on charging source and dispatch. There is a material capacity inconsistency: the user/NEM listing describes Belhaven Renewable Project as 408 MW / 816 MWh, Vena's current project page describes Belhaven BESS as 400 MW capable of storing up to 3,985 MWh, the NSW Planning Portal currently shows 400 MW / 3,985 MWh, while the 2023 scoping report described 400 MW / 800 MWh. The current Vena page says development application expected in Q2 2026 and construction anticipated in Q2/Q3 2027, so the earlier 2023 scoping report's 2025-2026 construction / 2026-2046 operation timing appears superseded.

4 Jun 2026

No generator-specific reported capex or financing announcement was found for Belhaven. The capex estimate uses CSIRO GenCost 2024-25 / Aurecon 2024-25 large-scale 2-hour lithium-ion BESS current cost of AUD 608,000/MWh, applied to the user-specified 816 MWh storage capacity: 816 * 608,000 = AUD 496.128 million. This is consistent with AUD 1.216 million/MW for a 2-hour battery. Fixed O&M uses Aurecon's 2-hour BESS fixed O&M value of AUD 8,000/MW-year applied to 408 MW. Extended warranties for 20-year LFP battery life are excluded from the fixed O&M field but Aurecon indicates an additional AUD 5,300/MW-year, giving a fixed O&M plus warranty total of AUD 13,300/MW-year if included. The project is still in development: Vena's current project page states the Belhaven BESS is at development stage and anticipates construction in Q2/Q3 2027, subject to approval. There is a capacity inconsistency across sources: the user/NEMStats record lists 408 MW / 816 MWh, Vena's general projects page and the 2023 scoping report refer to about 400 MW / 800 MWh or 2 hours, while Vena's current Belhaven page states 400 MW and up to 3,985 MWh. Financial estimates here are therefore based on the requested 408 MW / 816 MWh generator definition and should be revised if the latest 3,985 MWh configuration becomes the committed project scope. Direct operational emissions are treated as 0 tCO2/MWh for the battery asset itself; lifecycle and charging-energy emissions are excluded.

4 Jun 2026

Belhaven-specific technical, planning, operating-life and maintenance descriptions were found in Vena Energy/NSW planning documents, but no generator-specific final investment decision, EPC price, financing announcement, O&M contract, revenue agreement or fuel contract was found. Capex is therefore estimated from Aurecon/AEMO 2024 large-scale 2-hour lithium-ion BESS cost parameters: dedicated-grid-connection 2-hour BESS power component AUD 526/kW plus energy component AUD 314/kWh, applied to 408 MW / 816 MWh, plus AUD 10.0 million land/development allowance. Base fixed O&M from Aurecon is AUD 8,000/MW-year excluding extended warranties; the profile uses AUD 13,300/MW-year including AUD 5,300/MW-year indicative 20-year LFP battery extended warranty because battery augmentation/warranty is material over a 20-year life. Variable O&M is set to zero because Aurecon states BESS long-term service agreements are not typically fixed/variable and lists variable O&M as blank. Direct operational emissions intensity is treated as 0 tCO2/MWh for storage discharge; lifecycle, construction, fire-event and charging-market emissions are excluded. Capacity sources conflict: NSW planning/scoping documents describe about 400 MW / 800 MWh; NEMStats records 408/816 MW; Vena's current project page says 400 MW and up to 3,985 MWh. The estimate above follows the generator record supplied by the user and NEMStats (408 MW / 816 MWh). If the currently advertised 3,985 MWh configuration is used, the capex estimate would be materially higher. Current Vena page indicates DA expected Q2 2026 and construction Q2/Q3 2027, superseding the 2023 scoping report's older indicative 2025-2026 construction and 2026-2046 operation schedule.

Sources