Barcaldine Remote Community Solar Farm (BARCSF1)

Solar · Barcaldine Remote Community Solar Farm Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service QLD1 Solar - Solar NEM data · 24 hours
20 MW
Registered nameplate capacity
24 hours revenue
$1.3k
Capacity factor
7.4%
Revenue / MWh
$35.54
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
20 MW

AEMO status In Service
Project status Operational (AI)

Region QLD1
MLF 0.9410
DUID BARCSF1
Owner Barcaldine Remote Community Solar Farm Pty Ltd
Commissioned
Expected closure 2025-07-02
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
03 Jun 2026 22:40 → 04 Jun 2026 22:40 AEST

Dispatch & revenue

03 Jun 2026 22:40 → 04 Jun 2026 22:40 AEST

Revenue (× MLF)
$1.3k
Dispatched
35.6 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9410
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9370
2025-07-01 0.9410

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
20 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$67.60M

Shown in table
$67.60M (2026 real AUD)

How this was derived
The ARENA knowledge sharing report provides the selected reported construction cost of A$67.6m.

Reference
Barcaldine Solar Farm Knowledge Sharing Report (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$3,380,000

Shown in table
$3.38M (2026 real AUD)

How this was derived
The per-MW capex is a derived value using the user-supplied DUID AC capacity of 20 MW and the report's A$67.6m total construction cost.

Reference
Barcaldine Solar Farm Knowledge Sharing Report (high confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$240.0k

Shown in table
$240.0k (2026 real AUD)

How this was derived
Annual fixed O&M is a derived estimate: A$12/kW-year multiplied by 20 MW AC.

Reference
GenCost 2024-25: Final report (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$12,000

Shown in table
$12.0k (2026 real AUD)

How this was derived
No project-specific fixed O&M cost was found; GenCost's large-scale single-axis solar PV assumption is used as a technology default.

Reference
GenCost 2024-25: Final report (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
No project-specific variable O&M was found; GenCost's technology default for large-scale solar PV is used.

Reference
GenCost 2024-25: Final report (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
The project is a solar PV generator, so fuel cost and fuel supply contracts are not applicable.

Reference
Barcaldine Remote Community Solar Farm (high confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh

How this was derived
Heat rate is not applicable because the generator does not combust fuel. The table's 100% efficiency is treated as a modelling placeholder, not a module efficiency.

Reference
GenCost 2024-25: Final report (medium confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Capex is based on the asset-specific Foresight/ARENA knowledge-sharing report value of AUD 67.6m total project construction cost. Other public sources report similar but conflicting broader project values: ARENA project page AUD 70.1m total project cost, CEFC fact sheet AUD 69m, and Department of Industry AIP page AUD 60m estimated project value. Capex per MW uses 20 MW AC capacity. Fixed O&M and VOM are not generator-specific disclosures; they are technology defaults from Aurecon/AEMO 2024 large-scale solar PV single-axis tracking assumptions. Fixed O&M annual estimate applies AUD 12,000/MWp DC-year to the plant's 25 MW DC capacity, equivalent to AUD 300,000/year or AUD 15,000/MW AC-year. Variable O&M is treated as 0 because Aurecon states it is included in fixed O&M. Asset-specific operating notes include 2020-2021 voltage/reactive-control trip events, shutdown from 18 Aug 2021 to 22 Oct 2021, and rectification works via O&M contractor; no permanent closure notice was found.

Latest AI note (4 Jun 2026)

Best generator-specific capex source is the 2022 ARENA/Foresight knowledge sharing report, which reports A$67.6m total project construction cost for the 20 MW AC / 25 MW DC plant. Earlier public sources conflict: CEFC described a A$69m project in December 2015, ARENA currently lists A$70.1m total project cost, and the Australian Industry Participation page listed an estimated A$60m value. The selected capex preserves the reported project construction cost and uses COD year 2017 as the capex year because construction ran Jan-Dec 2016, commissioning Dec 2016-May 2017, and commercial operation date was 20 May 2017. Capex per MW is calculated on the DUID/AC capacity provided by the user: A$67.6m / 20 MW = A$3.38m/MW. Generator-specific fixed and variable O&M dollar values were not found; therefore O&M uses the current Australian GenCost 2024-25 large-scale solar PV single-axis tracking default: fixed O&M A$12/kW-year and variable O&M A$0/MWh, giving A$240,000/year for 20 MW. The project-specific report identifies ENcome Energy Performance Australia Pty Ltd as O&M contractor and the Elecnor presentation notes an O&M agreement with 2+3 years term, but no O&M price. Heat rate and thermal efficiency are not applicable for solar PV; GenCost includes a 100% placeholder efficiency for large-scale solar PV LCOE modelling, not a module or thermal conversion efficiency. Operational Scope 1 emissions intensity is treated as 0 tCO2-e/MWh for solar PV. No closure or major refurbishment announcement was found; site-specific portfolio life is reported as 28.5 years from commissioning, implying natural retirement around late 2045 if measured from 20 May 2017 COD, absent life extension or repowering.

Sources