Baking Board BESS (MMT)

BESS · MMT Projects T/A Renewable Projects Management · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
300 MW
Researched capacity
Est. SRMC
$1.50/MWh
Key information
Capacity (AI)
300 MW

AEMO/market listing and secondary compilations indicate a 300 MW battery project, but no reliable public source for MWh was found in the supplied search results.

AEMO status Publicly Announced
Project status Development (AI)

No primary-source evidence found that Baking Board BESS (MMT) has started construction or commissioning; project remains publicly announced/planned per available references.

Coordinates

DUID
Owner MMT Projects T/A Renewable Projects Management
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
13 Jun 2026 05:05 → 14 Jun 2026 05:05 AEST

Dispatch & revenue

13 Jun 2026 05:05 → 14 Jun 2026 05:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
300 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$501.15M

Shown in table
$501.15M (2026 real AUD)

How this was derived
Aurecon provides generic 2024 BESS cost parameters for a 200 MW 2-hour BESS. This is not a Baking Board-specific reported capex; it is scaled to 300 MW and assumes 2-hour storage.

Reference
2024 Energy Technology Cost and Technical Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MWh storage
$417,625

Shown in table
$417.6k (2026 real AUD)

How this was derived
Per-MWh capex depends entirely on the assumed 600 MWh energy capacity. Storage MWh was not found for the Baking Board BESS (MMT) listing.

Reference
2024 Energy Technology Cost and Technical Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$6.36M

Shown in table
$6.36M (2026 real AUD)

How this was derived
The 200 MW 2-hour total annual O&M with warranty of AUD 2.66m scales to AUD 3.99m/year for 300 MW.

Reference
2024 Energy Technology Cost and Technical Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$21,200

Shown in table
$21.2k (2026 real AUD)

How this was derived
Default O&M estimate uses Aurecon's 2-hour Li-ion BESS fixed O&M and extended warranty assumptions. It is not project-specific.

Reference
2024 Energy Technology Cost and Technical Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

How this was derived
Aurecon does not provide a variable O&M value for lithium-ion BESS and notes that service agreements are not typically fixed/variable split.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

How this was derived
A heat rate is not meaningful for electrochemical storage; round-trip efficiency is the relevant performance metric.

Reference
2024 Energy Technology Cost and Technical Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Confidence: low · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
No generator-specific capex, O&M, fuel contract, storage duration, online date, refurbishment plan, or closure date was found in the searched public sources. Identity and 300 MW capacity are sourced from NEM generation listings/NEMStats. Financial assumptions are technology defaults estimated from AEMO/Aurecon 2025 large-scale lithium-ion BESS assumptions. The estimate assumes a 300 MW / 1,200 MWh 4-hour LFP lithium-ion BESS with a dedicated grid connection and scales Aurecon's 200 MW / 800 MWh 4-hour BESS case linearly by 1.5. Capex includes EPC plus scaled land/development cost: (AUD 324.1m EPC + AUD 10.0m land/development) * 1.5 = AUD 501.15m. If the project is co-located with the separately listed Baking Board Solar Farm (MMT), Aurecon's co-located 4-hour case would imply a lower estimate of approximately AUD 485.0m including scaled land/development. Fixed O&M uses Aurecon's 4-hour fixed O&M plus 20-year extended warranty: AUD 4.24m per year for 200 MW, scaled to AUD 6.36m per year for 300 MW. Variable O&M is set to null because Aurecon states BESS long-term service agreements are not typically fixed/variable split. Efficiency is beginning-of-life round-trip efficiency at the point of connection, not thermal efficiency. Direct operational emissions are treated as zero; lifecycle and grid-charging emissions are excluded. Major refurbishment/closure: Aurecon assumes 20-year economic/design and technical/operational life; life may extend to about 25 years after condition assessment and further with battery upgrades.

Sources