13 Jun 2026 02:20 → 14 Jun 2026 02:20 AEST
| Capex total (greenfield) |
$36.92M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.89M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$13,502
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$1.50
Shown in table How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in the searched sources. Public project materials identify Axedale as a 140 MW solar farm with a 50 MW/100 MWh BESS, but no total project investment figure was located. OPEX defaults therefore use AEMO/Aurecon 2024 battery storage benchmark values for fixed O&M and no variable O&M for BESS. The site webpage and fact sheet describe FRV as the current owner/developer, indicating ownership has changed from earlier UPC/AC Renewables references.