Avonlie Solar Farm (AVLSF1)

Solar · Iberdrola Australia Limited · Solar PV - Single axis tracking

In Service NSW1 Solar - Solar NEM data · 24 hours
254 MW
Registered nameplate capacity
24 hours revenue
$22.0k
Capacity factor
4.9%
Revenue / MWh
$74.33
Est. SRMC
$0.25/MWh
MLF
0.8698

Stats window 29 May 2026 04:00 → 30 May 2026 04:00 AEST

Key information
Capacity
254 MW
Status In Service
Lifecycle Operating
Region NSW1
DUID AVLSF1
Owner Iberdrola Australia Limited
Commissioned 1 Nov 2023
Expected closure 2025-07-02
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar

Dispatch & revenue

29 May 2026 04:00 → 30 May 2026 04:00 AEST

Revenue (× MLF)
$22.0k
Dispatched
295.8 MWh
Available
295.8 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.8698
end of period

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8446
2025-07-01 0.8698

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
254 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW default
$1,300,000
Capex / MWh storage
Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000
Variable OPEX / MWh default
$0.25
Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown