BESS · VALENT ENERGY DEVELOPMENTS PTY LTD · Storage - Battery
03 Jun 2026 17:55 → 04 Jun 2026 17:55 AEST
| Capex total (greenfield) |
$214.14M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$713,798
Shown in table |
| Fixed OPEX (annual) |
$4.09M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$27,293
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.64
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Project-specific reported capital cost of about AUD 209 million was identified for the 150 MW/437 MWh Armidale BESS. The project is scheduled to complete in 2027 / go online in 2028 in the sources consulted; capex year is set to the 2025 approval/announcement year because the source figure appears in that context. Fixed O&M and variable O&M use the provided internal defaults because no plant-specific operating cost was found. Battery assets have no fuel cost or heat rate; emissions intensity is set to zero.