BESS · Ardandra SF Pty Ltd as trustee for Ardandra SF Trust · Storage - Battery
13 Jun 2026 20:55 → 14 Jun 2026 20:55 AEST
| Capex total (greenfield) |
$6.33M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$84,403
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.47M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$19,651
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.22
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Plant-specific project cost found in an Octopus Australia/OREO document for the Ardandra project: development cost expected to be $5.8m, with acquisition and construction commencement in 2025 and full operations in 2027. This is a project-specific reported figure, but it appears to describe development/acquisition spend rather than full greenfield EPC capex for the eventual built asset; capex fields therefore reflect the reported figure with caution. The site page also describes Ardandra as a 97MW hybrid solar and 75MW/150MWh battery project, while the user-provided registered capacity is 75.02 MW. No separate plant-specific greenfield total construction cost announcement was found.