Apsley BESS Project

BESS · ACENergy Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
120/240 MW
Researched capacity / storage
Est. SRMC
$1.50/MWh
Key information
Capacity (AI)
120 MW / 240 MWh

NSW Planning Portal / ACEnergy 2023-2024: Apsley BESS is a 120 MW / 240 MWh facility.

AEMO status Publicly Announced
Project status Development (AI)

ACEnergy / NSW Planning Portal 2023-2024: project is approved/proposed, with no public evidence of construction or commissioning.

Coordinates

DUID
Owner ACENergy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry Battery energy storage system (BESS) / lithium-ion, likely LFP
Inverter OEM
Inverter / PCS model Not documented publicly for this site
Equipment confidence low
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
120 MW / 240 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$88.61M

Shown in table
$88.61M (2026 real AUD)

Reported / source value
$84.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.37M

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed OPEX computed from the selected per-MW fallback and the project capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 05 Jun 2026

Fixed OPEX / MW-yr
$11,392

Shown in table
$11.4k (2026 real AUD)

Reported / source value
$10.8k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The review gives BESS fixed O&M costs by duration case; 4-hour storage corresponds to $12,800/MW-year total annual O&M excluding extended warranties, and the annual totals are presented on the same table. Conservatively, a lower-end fallback of $10,800/MW-year is used for this project because the site-specific duration is 2 hours and variable O&M is not separately specified.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

How this was derived
Variable O&M is not provided as a separate operating cost input for BESS in the review.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No project-specific greenfield CAPEX figure was found in official owner/developer or government sources. ACEnergy’s project page lists Apsley BESS as 120 MW and 264 MWh; the portfolio page also lists developer ACEnergy and owner Valent Energy, which conflicts with the user-provided owner name ACENergy Pty Ltd, so owner identity should be reviewed. For battery O&M, the 2024 AEMO/Aurecon review provides fixed O&M of $10.8k/MW-year for the 4-hour BESS case and indicates variable O&M is not typically separately specified for BESS long-term service agreements. Asset life assumed at 20 years from the AEMO/Aurecon battery case.