12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST
| Capex total (greenfield) |
$88.61M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.37M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$11,392
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$1.50
Shown in table How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No project-specific greenfield CAPEX figure was found in official owner/developer or government sources. ACEnergy’s project page lists Apsley BESS as 120 MW and 264 MWh; the portfolio page also lists developer ACEnergy and owner Valent Energy, which conflicts with the user-provided owner name ACENergy Pty Ltd, so owner identity should be reviewed. For battery O&M, the 2024 AEMO/Aurecon review provides fixed O&M of $10.8k/MW-year for the 4-hour BESS case and indicates variable O&M is not typically separately specified for BESS long-term service agreements. Asset life assumed at 20 years from the AEMO/Aurecon battery case.