Adelaide Desalination Plant (ADPPV2)

Solar · South Australian Water Corporation · Solar PV - Fixed

Operational AEMO: In Service SA1 Solar - Solar NEM data · 24 hours
14 MW
Registered nameplate capacity
Est. SRMC
$0.00/MWh
Key information
Capacity
14 MW

AEMO status In Service
Project status Operational (AI)

Region SA1
Coordinates

DUID ADPPV2
Owner South Australian Water Corporation
Commissioned Jul 2022
Expected closure 2041
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
13 Jun 2026 18:20 → 14 Jun 2026 18:20 AEST

Dispatch & revenue

13 Jun 2026 18:20 → 14 Jun 2026 18:20 AEST

No dispatch data for DUID ADPPV2 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar PV
Capacity
14 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$20.00M

Shown in table
$20.00M (2026 real AUD)

Capex refurbishment
Capex / MW derived
$1,454,545

Shown in table
$1.45M (2026 real AUD)

Fixed OPEX (annual)
$500.0k

Shown in table
$500.0k (2026 real AUD)

Fixed OPEX / MW-yr
$36,364

Shown in table
$36.4k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 02 Jun 2026

Notes
The fixed O&M costs are based on industry standards for solar PV systems. The emissions intensity is based on the renewable nature of solar energy.

Sources