Other Generators · South Australian Water Corporation · Hydro - Run of River
Stats window 03 Jun 2026 15:45 → 04 Jun 2026 15:45 AEST
03 Jun 2026 15:45 → 04 Jun 2026 15:45 AEST
| Capex total (greenfield) |
$1.00M
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,000,000
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$50.0k
|
| Fixed OPEX / MW-yr |
$50,000
|
| Variable OPEX / MWh |
$10.00
|
| Fuel cost / GJ |
$0.00
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 02 Jun 2026
Notes
The Adelaide Desalination Plant primarily uses hydroelectric power, leading to low emissions intensity. Fixed O&M costs are based on industry standards for similar hydro facilities.