← Asset Watch · Generator profile

Ticoba BESS

QLD · BESS ·
Data unavailable
Net SCADA
—
Declared availability
—
Regional price
—
Data unavailable for this window. 0 intervals loaded.

Material events

Data unavailable.

Peer comparison

Same technology (BESS) and region (QLD). One row per site — DUIDs at the same site are combined and energy-weighted. Period 29 Oct 09:37 – 5 Nov 09:37 NEM time. Coverage 0%. Charge-weighted and discharge-weighted regional reference prices, and the spread between them. Weighted by SCADA energy in each 5-minute interval. Excludes contracts, FCAS, fees, degradation and other costs. Not profit and not a judgement of operator decisions.

Asset Charge MWhCharge-weightedDischarge MWhDischarge-weightedSpread
Ticoba BESS (this asset) 0.0 — 0.0 — —
Bouldercombe Battery project 288.9 $47.42/MWh 262.9 $107.08/MWh +$59.66/MWh
Brendale BESS 1,355.6 $40.04/MWh 1,219.6 $107.73/MWh +$67.69/MWh
Chinchilla BESS 615.4 $37.77/MWh 498.4 $103.94/MWh +$66.17/MWh
Greenbank BESS 1,428.7 $33.85/MWh 1,168.1 $106.65/MWh +$72.79/MWh
Kennedy Energy Park - Phase 1 - Storage 0.0 — 7.6 $109.96/MWh —
Supernode BESS (5 units) 4,876.4 $33.55/MWh 4,209.1 $108.32/MWh +$74.77/MWh
Swanbank BESS 1,712.3 $39.29/MWh 1,608.6 $106.39/MWh +$67.11/MWh
Tarong BESS - Stanwell 2,102.1 $39.71/MWh 1,859.1 $105.70/MWh +$65.99/MWh

Detection defaults for BESS

Availability drop 10.0 MW or 15%; output drop 15.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.