← Asset Watch · Generator profile

Pacific Green Energy Park - Limestone Coast North

SA · BESS ·
Data unavailable
Net SCADA
—
Declared availability
—
Regional price
—
Data unavailable for this window. 0 intervals loaded.

Material events

Data unavailable.

Peer comparison

Same technology (BESS) and region (SA). One row per site — DUIDs at the same site are combined and energy-weighted. Period 2 Nov 01:41 – 9 Nov 01:41 NEM time. Coverage 0%. Charge-weighted and discharge-weighted regional reference prices, and the spread between them. Weighted by SCADA energy in each 5-minute interval. Excludes contracts, FCAS, fees, degradation and other costs. Not profit and not a judgement of operator decisions.

Asset Charge MWhCharge-weightedDischarge MWhDischarge-weightedSpread
Pacific Green Energy Park - Limestone Coast North (this asset) 0.0 — 0.0 — —
Adelaide Desalination Plant 37.0 $-59.81/MWh 30.1 $109.59/MWh +$169.40/MWh
Blyth BESS 888.4 $-17.76/MWh 599.2 $123.29/MWh +$141.05/MWh
Bolivar Waste Water Treatment 13.1 $-51.25/MWh 10.8 $108.05/MWh +$159.31/MWh
Christies Beach Wastewater Treatment Plant 6.2 $-33.92/MWh 5.4 $116.74/MWh +$150.66/MWh
Clements Gap - BESS 670.3 $-79.02/MWh 631.8 $91.06/MWh +$170.08/MWh
Dalrymple BESS 51.4 $10.41/MWh 27.8 $113.67/MWh +$103.25/MWh
Happy Valley Reservoir 13.6 $-86.22/MWh 10.7 $106.19/MWh +$192.41/MWh
Hornsdale Power Reserve Unit 1 495.4 $-44.30/MWh 378.7 $103.34/MWh +$147.65/MWh

Detection defaults for BESS

Availability drop 10.0 MW or 15%; output drop 15.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.