Gas Peakers · LMS Energy Pty Ltd · Reciprocating Engine - Spark ignition
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST
| Capex total (greenfield) |
$20.73M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,637,131
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$298.5k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$37,975
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$9.49
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$6.00
Shown in table |
| Heat rate GJ/MWh |
7.94
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
Wollert appears to have been operating since 2006 and is reported by LMS Energy as a bioenergy/landfill-gas facility. I found no credible plant-specific greenfield capex announcement for Wollert, so capex is left null rather than substituting a benchmark. The O&M and heat-rate assumptions are taken from AEMO/Aurecon reciprocating-engine benchmark material for landfill/biogas-style plant economics, which is a proxy rather than site-specific data.