Gas Peakers · EDL LFG SA Pty Ltd · Reciprocating Engine - Spark ignition
15 May 2026 15:25 → 14 Jun 2026 15:25 AEST
| Capex total (greenfield) |
$10.81M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,637,131
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.02M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$248,477
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$14.55
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$6.00
Shown in table |
| Heat rate GJ/MWh default |
9.00
Shown in table |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in official owner/government sources. For operating assumptions, AEMO's 2024 cost and parameter review provides a hypothetical biogas project with fixed O&M of $235,556/MW-yr and variable O&M of $13.79/MWh (net), but the report does not provide a direct landfill-gas reciprocating-engine heat rate, fuel price, or emissions factor for Wingfield II. Wingfield II is listed by EDL as 4.1 MW with start of operation in 1991.