Other Generators · Tully Sugar Limited · Turbine - Steam Super Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
04 Jun 2026 01:20 → 05 Jun 2026 01:20 AEST
Estimated $ per interval using regional RRP and MLF effective on each day.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).| Capex total (greenfield) default |
$144.00M
Shown in table |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW default |
$4,500,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$70,000
Shown in table |
| Variable OPEX / MWh default |
$5.00
Shown in table |
| Fuel cost / GJ default |
$8.00
Shown in table |
| Heat rate GJ/MWh default |
14.00
Shown in table |
Confidence: unknown · Status: needs review · Capex basis: unknown