Ti Tree Bioenergy

Gas Peakers · Ti Tree Bioenergy · Reciprocating Engine - Compression ignition

Operational AEMO: In Service Renewable Biomass or Waste - Landfill Gas NEM data · 30 days
1 MW
Registered nameplate capacity
Est. SRMC
$123.42/MWh
Key information
Capacity
1 MW

AEMO status In Service
Project status Operational (AI)

Coordinates

DUID
Owner Ti Tree Bioenergy
Commissioned
Expected closure 2072
Closure date
Technology Reciprocating Engine - Compression ignition
Fuel Renewable Biomass or Waste - Landfill Gas
Plant supplier
Boiler / turbine equipment
Stats window
16 May 2026 06:20 → 15 Jun 2026 06:20 AEST

Dispatch & revenue

16 May 2026 06:20 → 15 Jun 2026 06:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Biomass
Capacity
1 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$123.42/MWh
Capex total (greenfield)
$5.70M

Shown in table
$5.70M (2026 real AUD)

Reported / source value
$5.40M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No reliable plant-specific greenfield investment figure was found in owner, government, or project-finance sources.

Capex refurbishment
Capex / MW derived
$4,746,835

Shown in table
$4.75M (2026 real AUD)

Reported / source value
$4.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$88.6k

Shown in table
$88.6k (2026 real AUD)

Reported / source value
$84.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$73,840

Shown in table
$73.8k (2026 real AUD)

Reported / source value
$70.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used supplied internal technology default because plant-specific O&M benchmark was not retrieved for this asset.

Variable OPEX / MWh
$5.27

Shown in table
$5.27 (2026 real AUD)

Reported / source value
$5.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used supplied internal technology default because plant-specific O&M benchmark was not retrieved for this asset.

Fuel cost / GJ
$8.44

Shown in table
$8.44 (2026 real AUD)

Reported / source value
$8.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used supplied internal technology default because no fuel contract or equivalent fuel-cost source was found.

Heat rate GJ/MWh
14.00

Shown in table
$14.00 (2026 real AUD)

How this was derived
Used supplied internal technology default because a plant-specific technical parameter was not found.

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
Plant-specific greenfield capex could not be verified from owner, developer, or government sources in the available search results. Ti Tree Bioenergy states the site has operated since 2002, and an Edina announcement in 2017 confirms a 1.2 MW engine addition to existing 3 x 1.15 MW engines; however, no total project investment figure was found for the original plant or the 2017 expansion. Operating cost and performance assumptions therefore use the provided fallback defaults. The facility was established in Willowbank in 2002.

Sources