Tableland Mill

Other Generators · MSF Sugar · Turbine - Steam Sub Critical

Operational AEMO: In Service Other - Other NEM data · 24 hours
24 MW
Registered nameplate capacity
Est. SRMC
$2.00/MWh
Key information
Capacity
24 MW

AEMO status In Service
Project status Operational (AI)

Coordinates

DUID
Owner MSF Sugar
Commissioned
Expected closure 2040
Closure date
Technology Turbine - Steam Sub Critical
Fuel Other - Other
Equipment OEM
Equipment type / model
Stats window
14 Jun 2026 17:05 → 15 Jun 2026 17:05 AEST

Dispatch & revenue

14 Jun 2026 17:05 → 15 Jun 2026 17:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
24 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield)
$132.28M

Shown in table
$132.28M (2026 real AUD)

Reported / source value
$100.00M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner-reported total project cost for the Tableland Green Energy Power Plant at Tableland Mill.

Reference
Tableland Green Energy Power Plant – MSF Sugar (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW derived
$5,511,464

Shown in table
$5.51M (2026 real AUD)

Reported / source value
$4.17M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived capex per MW from owner-reported total cost and site capacity.

Reference
Tableland Green Energy Power Plant – MSF Sugar (high confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
MSF Sugar’s Tableland Green Energy Power Plant at the Tableland Mill is described by the owner as a $100 million project producing 24 MW from bagasse. A prior owner update in February 2018 described the project as a $75 million plant with an $18 million steam turbine generator during construction, so the owner’s later $100 million figure is used as the best available reported total project cost. No plant-specific O&M, heat-rate, fuel-cost, or asset-life figures were found in the searched sources.

Sources