Susan River Solar Farm (SRSF1)

Solar · Susan River Solar Pty Ltd as trustee for the Susan River Solar Trust · Solar PV - Single axis tracking

In Service QLD1 Solar - Solar NEM data · 24 hours
85 MW
Registered nameplate capacity
24 hours revenue
$468
Capacity factor
0.2%
Revenue / MWh
$95.45
Est. SRMC
$0.25/MWh
MLF
0.9772

Stats window 29 May 2026 04:00 → 30 May 2026 04:00 AEST

Key information
Capacity
85 MW
Status In Service
Lifecycle Operating
Region QLD1
DUID SRSF1
Owner Susan River Solar Pty Ltd as trustee for the Susan River Solar Trust
Commissioned Dec 2019
Expected closure 2025-07-02
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model

Dispatch & revenue

29 May 2026 04:00 → 30 May 2026 04:00 AEST

Revenue (× MLF)
$468
Dispatched
4.9 MWh
Available
4.9 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9772
end of period

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9828
2025-07-01 0.9772

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
85 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW default
$1,300,000
Capex / MWh storage
Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000
Variable OPEX / MWh default
$0.25
Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown