Stubbo Solar Farm (STUBSF2)

Solar · ACEN AUSTRALIA · Solar PV - Single axis tracking

Commissioning AEMO: In Commissioning NSW1 Solar - Solar NEM data · 24 hours
198 MW
Registered nameplate capacity
24 hours revenue
$4.0k
Capacity factor
2.1%
Revenue / MWh
$40.95
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
198 MW

AEMO status In Commissioning
Project status Commissioning (AI)

Region NSW1
MLF 0.9429
DUID STUBSF2
Owner ACEN AUSTRALIA
Commissioned Dec 2024
Expected closure 2073-07-02
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
04 Jun 2026 01:20 → 05 Jun 2026 01:20 AEST

Dispatch & revenue

04 Jun 2026 01:20 → 05 Jun 2026 01:20 AEST

Revenue (× MLF)
$4.0k
Dispatched
97.7 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9429
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-12-17 0.9422
2025-07-01 0.9429

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
198 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$257.40M

Shown in table
$257.40M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown