Snuggery (SNUGNL1)

Other Generators · Synergen Power Pty Ltd · Turbine - OCGT

Closed AEMO: In Service - Announced Withdrawal (Permanent) SA1 Fossil - Diesel NEM data · 30 days
21 MW
Registered nameplate capacity
Est. SRMC
$2.00/MWh
Key information
Capacity
21 MW

AEMO status In Service - Announced Withdrawal (Permanent)
Project status Closed (AI)

Region SA1
Coordinates —

DUID SNUGNL1
Owner Synergen Power Pty Ltd
Commissioned —
Expected closure 2028
Closure date 1 Jan 2028
Technology Turbine - OCGT
Fuel Fossil - Diesel
Equipment OEM —
Equipment type / model —
Stats window
26 Aug 2026 17:05 → 25 Sep 2026 17:05 AEST

Dispatch & revenue

26 Aug 2026 17:05 → 25 Sep 2026 17:05 AEST

No dispatch data for DUID SNUGNL1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
21 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield) default
$42.00M

Shown in table
$42.00M (2026 real AUD)

Capex refurbishment
—
Capex / MW default
$2,000,000

Shown in table
$2.00M (2026 real AUD)

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: unknown · Status: needs review · Capex basis: unknown