Other Generators · Diamond Energy Pty Ltd · Reciprocating Engine - Spark ignition
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST
| Capex total (greenfield) |
$2.90M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,637,131
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$272.2k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$247,470
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$14.55
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$6.00
Shown in table |
| Heat rate GJ/MWh |
9.00
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
Plant-specific greenfield capex could not be verified from owner/developer/government sources in the search performed, so capex fields are left null rather than using benchmark values. O&M and operating parameters use AEMO 2024 bioenergy / reciprocating-engine benchmark-style assumptions as a fallback. The site appears to have been operational since 2007 based on GV Water materials, but this is not treated as a capex source.