Shepparton Wastewater Treatment Facility

Other Generators · Diamond Energy Pty Ltd · Reciprocating Engine - Spark ignition

Operational AEMO: In Service Renewable Biomass or Waste - Biogas NEM data · 24 hours
1 MW
Registered nameplate capacity
Est. SRMC
$68.55/MWh
Key information
Capacity
1 MW

AEMO status In Service
Project status Operational (AI)

Coordinates

DUID
Owner Diamond Energy Pty Ltd
Commissioned
Expected closure 2038
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Renewable Biomass or Waste - Biogas
Plant supplier
Boiler / turbine equipment
Stats window
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

Dispatch & revenue

13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Waste / landfill gas
Capacity
1 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$68.55/MWh
Capex total (greenfield)
$2.90M

Shown in table
$2.90M (2026 real AUD)

Reported / source value
$2.75M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific greenfield construction/investment cost was found in searched owner/government/primary sources.

Capex refurbishment
Capex / MW derived
$2,637,131

Shown in table
$2.64M (2026 real AUD)

Reported / source value
$2.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$272.2k

Shown in table
$272.2k (2026 real AUD)

Reported / source value
$258.1k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$247,470

Shown in table
$247.5k (2026 real AUD)

Reported / source value
$234.6k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark fixed O&M per MW for bioenergy/waste-gas style plant used as fallback.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 06 Jun 2026

Variable OPEX / MWh
$14.55

Shown in table
$14.55 (2026 real AUD)

Reported / source value
$13.79 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark variable O&M per MWh used as fallback.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 06 Jun 2026

Fuel cost / GJ default
$6.00

Shown in table
$6.00 (2026 real AUD)

Heat rate GJ/MWh
9.00

Shown in table
$9.00 (2026 real AUD)

How this was derived
Used the provided internal default heat rate because the searched sources did not expose a site-specific biogas reciprocating-engine heat rate for Shepparton.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 06 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
Plant-specific greenfield capex could not be verified from owner/developer/government sources in the search performed, so capex fields are left null rather than using benchmark values. O&M and operating parameters use AEMO 2024 bioenergy / reciprocating-engine benchmark-style assumptions as a fallback. The site appears to have been operational since 2007 based on GV Water materials, but this is not treated as a capex source.

Sources