Racecourse Mill

Other Generators · Mackay Sugar Ltd · Turbine - Steam Sub Critical

Operational AEMO: In Service Other - Other NEM data · 7 days
45 MW
Registered nameplate capacity
Est. SRMC
$21.28/MWh
Key information
Capacity
45 MW

AEMO status In Service
Project status Operational (AI)

Coordinates

DUID
Owner Mackay Sugar Ltd
Commissioned
Expected closure 2035
Closure date
Technology Turbine - Steam Sub Critical
Fuel Other - Other
Equipment OEM
Equipment type / model
Stats window
08 Jun 2026 04:30 → 15 Jun 2026 04:30 AEST

Dispatch & revenue

08 Jun 2026 04:30 → 15 Jun 2026 04:30 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
45 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$21.28/MWh
Capex total (greenfield)
$185.19M

Shown in table
$185.19M (2026 real AUD)

Reported / source value
$120.00M (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported greenfield project investment for the Racecourse Mill cogeneration plant.

Reference
Queensland Government funds Mackay Sugar Co-generation Project (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW derived
$4,115,226

Shown in table
$4.12M (2026 real AUD)

Reported / source value
$2.67M (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$14.33M

Shown in table
$14.33M (2026 real AUD)

Reported / source value
$9.29M (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed O&M is estimated from benchmark per-MW O&M and the 45 MW site capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 06 Jun 2026

Fixed OPEX / MW-yr
$318,488

Shown in table
$318.5k (2026 real AUD)

Reported / source value
$206.4k (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as closest available AEMO benchmark for a biomass/steam-based generator; converted to per-MW basis in the profile.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 06 Jun 2026

Variable OPEX / MWh
$21.28

Shown in table
$21.28 (2026 real AUD)

Reported / source value
$13.79 (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Closest available benchmark variable O&M for steam-based biomass/waste generation.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 06 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Mackay Sugar/Queensland Government source states contracts were issued in February 2010 for a $120 million power plant at Racecourse Mill to generate more than 90 MW of electricity from sugar cane waste; plant details in the same release indicate a new steam turbine generator and 65 MW thermal / 27 MW electric output. No separate plant-specific refurbishment cost identified. O&M values were not found specifically for Racecourse Mill, so AEMO 2024 biomass/biorefinery-type benchmark values were used as a fallback for a steam-biomass cogeneration plant; fixed O&M was interpreted from the AEMO review's annual fixed O&M figure for the relevant biomass/steam generation case and converted to a per-MW basis using 45 MW capacity.