BESS · Zen Energy Future Pty Ltd · Storage - Battery
04 Jun 2026 02:35 → 05 Jun 2026 02:35 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$350,000
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No project-specific greenfield capex announcement was found for Noblevale BESS. The ZEBRE project page identifies Noblevale as a 180 MW/360 MWh battery in feasibility stage and does not disclose cost. AEMO generation information confirms the project is a third-party proposed future project, but does not provide capex. Given the instructions, I did not substitute AEMO benchmark capex where a project-specific figure was not found. Asset life defaulted to 15 years only as an operating assumption aligned with battery benchmark practice; all other O&M and performance fields were left blank due to lack of plant-specific or acceptable benchmark-backed values in the retrieved sources.