03 Jun 2026 18:15 → 04 Jun 2026 18:15 AEST
| Capex total (greenfield) default |
$28.76M
Shown in table |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW default |
$4,500,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$70,000
Shown in table |
| Variable OPEX / MWh default |
$5.00
Shown in table |
| Fuel cost / GJ default |
$8.00
Shown in table |
| Heat rate GJ/MWh default |
14.00
Shown in table |
Confidence: unknown · Status: needs review · Capex basis: unknown