Morgan To Whyalla Pipeline No 3 PS (MWPS3PV1)

Solar · South Australian Water Corporation · Solar PV - Single axis tracking

Operational AEMO: In Service SA1 Solar - Solar NEM data · 24 hours
8 MW
Registered nameplate capacity
24 hours revenue
$8
Capacity factor
0.7%
Revenue / MWh
$5.75
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
8 MW

AEMO status In Service
Project status Operational (AI)

Region SA1
MLF 0.9897
DUID MWPS3PV1
Owner South Australian Water Corporation
Commissioned Jun 2022
Expected closure 2025-07-02
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
03 Jun 2026 21:00 → 04 Jun 2026 21:00 AEST

Dispatch & revenue

03 Jun 2026 21:00 → 04 Jun 2026 21:00 AEST

Revenue (× MLF)
$8
Dispatched
1.3 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9897
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9787
2025-07-01 0.9897

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
8 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$9.75M

Shown in table
$9.75M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown