Lonsdale (LONSDALE)

Other Generators · Lumo Generation SA Pty Ltd · Reciprocating Engine - Compression ignition

Operational AEMO: In Service SA1 Fossil - Diesel NEM data · 24 hours
20 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$308.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
20 MW

AEMO status In Service
Project status Operational (AI)

Region SA1
MLF 1.0037
DUID LONSDALE
Owner Lumo Generation SA Pty Ltd
Commissioned
Expected closure 2070-07-02
Closure date
Technology Reciprocating Engine - Compression ignition
Fuel Fossil - Diesel
Engine OEM
Engine model
Stats window
03 Jun 2026 22:10 → 04 Jun 2026 22:10 AEST

Dispatch & revenue

03 Jun 2026 22:10 → 04 Jun 2026 22:10 AEST

Revenue (× MLF)
$0
Dispatched
MWh
Available
115.6 MWh
Curtailed
115.6 MWh
Curtailment
100.0%
of available
MLF used
1.0037
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 1.0025
2025-07-01 1.0037

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Diesel
Capacity
20 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$308.00/MWh
Capex total (greenfield) default
$30.24M

Shown in table
$30.24M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,500,000

Shown in table
$1.50M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$60,000

Shown in table
$60.0k (2026 real AUD)

Variable OPEX / MWh default
$8.00

Shown in table
$8.00 (2026 real AUD)

Fuel cost / GJ default
$25.00

Shown in table
$25.00 (2026 real AUD)

Heat rate GJ/MWh default
12.00

Shown in table
$12.00 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown