Laverton North (LNGS2)

Gas Peakers · Snowy Hydro Ltd · Turbine - OCGT

Operational AEMO: In Service VIC1 Fossil - Natural Gas Pipeline NEM data · 584h
156 MW
Registered nameplate capacity
584h revenue
$66.0k
Capacity factor
0.7%
Revenue / MWh
$100.78
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
156 MW

AEMO status In Service
Project status Operational (AI)

Snowy Hydro gas and diesel generation page (snowyhydro.com.au, accessed 2026) states Laverton North was commissioned in 2006 and is part of Snowy Hydro's operating gas fleet.

Region VIC1
Coordinates -37.84163, 144.78873 (AI)

Global Energy Observatory profile for Laverton North OCGT Power Plant lists coordinates -37.84163, 144.78873 (globalenergyobservatory.org).

MLF 0.9999
DUID LNGS2
Owner Snowy Hydro Ltd
Commissioned —
Expected closure 2070
Closure date —
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE
Turbine / engine model LM6000
Equipment confidence high
Stats window
01 Sep 2026 00:00 → 25 Sep 2026 07:40 AEST

Dispatch & revenue

01 Sep 2026 00:00 → 25 Sep 2026 07:40 AEST

Energy revenue (× MLF)
$66.0k
FCAS revenue (× MLF)
$0
FCAS volume
— MWh
Dispatched
654.8 MWh
Available
89,664.5 MWh
Curtailed
89,009.7 MWh
Curtailment
99.3%
of available
MLF used
0.9999
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9975
2025-07-01 0.9982
2026-07-01 0.9999

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
156 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield) default
$187.20M

Shown in table
$187.20M (2026 real AUD)

Capex refurbishment
—
Capex / MW default
$1,200,000

Shown in table
$1.20M (2026 real AUD)

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown