22 MW
Registered nameplate capacity
24 hours revenue
$18.1k
Capacity factor
54.3%
Revenue / MWh
$64.47
Est. SRMC
$1.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
22 MW

AEMO status In Service
Project status Operational (AI)

Region QLD1
MLF 0.9828
DUID KAREEYA2
Owner CleanCo Queensland Limited
Commissioned
Expected closure 2025-07-02
Closure date
Technology Hydro - Run of River
Fuel Hydro - Water
Turbine OEM
Turbine type / model
Stats window
03 Jun 2026 21:20 → 04 Jun 2026 21:20 AEST

Dispatch & revenue

03 Jun 2026 21:20 → 04 Jun 2026 21:20 AEST

Revenue (× MLF)
$18.1k
Dispatched
281.3 MWh
Available
150.3 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9828
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9642
2025-07-01 0.9828

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
22 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.00/MWh
Capex total (greenfield) default
$86.40M

Shown in table
$86.40M (2026 real AUD)

Capex refurbishment
Capex / MW default
$4,000,000

Shown in table
$4.00M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$1.00

Shown in table
$1.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown