BESS · Junction Rivers Pty Ltd · Storage - Battery
14 Jun 2026 00:00 → 14 Jun 2026 00:20 AEST
| Capex total (greenfield) |
$2,109.70M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
How this was derived Reference |
| Fixed OPEX (annual) |
$2.70M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$13,502
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Project-specific owner website describes Junction Rivers as a '$2 billion+ wind energy and storage project'. Site materials also describe the project as 600 MW wind plus 200 MW/800 MWh battery. Because the DUID name suggests a battery unit but the only project-level reported capex found is for the combined wind-and-storage project, capex_total_aud is assigned to the whole project and per-MW/per-MWh figures are calculated against the 200 MW/800 MWh battery share for this DUID. Fixed O&M was derived from the AEMO/Aurecon 2024 BESS benchmark of $1.6m/yr for a 200 MW 4-hour system, scaled linearly to 200 MW. Variable O&M uses the fallback default. No plant-specific refurbishment cost or battery replacement announcement was found.