Gas Peakers · EDL LFG NSW Pty Ltd · Reciprocating Engine - Spark ignition
15 Jun 2026 00:00 → 15 Jun 2026 04:00 AEST
| Capex total (greenfield) |
$6.07M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,637,131
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$71.5k
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$31,100
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$8.98
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$6.33
Shown in table Reported / source value |
| Heat rate GJ/MWh |
8.79
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Plant-specific greenfield capex could not be verified from owner/developer/government sources in available search results. Jacks Gully is an EDL landfill gas site with 2 MW capacity on EDL's project page, while the NEM register data referenced elsewhere indicates 2.3 MW for JACKSGUL; operating assumptions therefore use the AEMO/Aurecon reciprocating-engine landfill-gas benchmark as an estimated fallback. The benchmark is for a hypothetical 211.2 MW natural-gas reciprocating-engine plant, so it is only a proxy for O&M and performance, not reported project-specific capex.