Jacks Gully (JACKSGUL)

Gas Peakers · EDL LFG NSW Pty Ltd · Reciprocating Engine - Spark ignition

AEMO: removed NSW1 Renewable Biomass or Waste - Landfill Gas NEM data · 24 hours
2 MW
Registered nameplate capacity
Est. SRMC
$64.61/MWh
Key information
Capacity
2 MW

AEMO status removed
Project status (AI)

Region NSW1
Coordinates

DUID JACKSGUL
Owner EDL LFG NSW Pty Ltd
Commissioned
Expected closure 2025
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Renewable Biomass or Waste - Landfill Gas
Plant supplier
Boiler / turbine equipment
Stats window
13 Jun 2026 19:20 → 14 Jun 2026 19:20 AEST

Dispatch & revenue

13 Jun 2026 19:20 → 14 Jun 2026 19:20 AEST

No dispatch data for DUID JACKSGUL in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Waste / landfill gas
Capacity
2 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$64.61/MWh
Capex total (greenfield)
$6.07M

Shown in table
$6.07M (2026 real AUD)

Reported / source value
$5.75M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$2,637,131

Shown in table
$2.64M (2026 real AUD)

Reported / source value
$2.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$71.5k

Shown in table
$71.5k (2026 real AUD)

Reported / source value
$67.8k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed O&M calculated from the benchmark and the user-supplied 2.3 MW capacity.

Reference
2024 Energy Technology Cost and Technical Parameters Review (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX / MW-yr
$31,100

Shown in table
$31.1k (2026 real AUD)

Reported / source value
$29.5k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Aurecon's 2024 review provides a fixed O&M benchmark for the hypothetical reciprocating-engine project; used as an estimated proxy for this waste-gas engine site.

Reference
2024 Energy Technology Cost and Technical Parameters Review (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$8.98

Shown in table
$8.98 (2026 real AUD)

Reported / source value
$8.51 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Aurecon's 2024 review provides a variable O&M benchmark for the hypothetical reciprocating-engine project; used as an estimated proxy.

Reference
2024 Energy Technology Cost and Technical Parameters Review (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
$6.33

Shown in table
$6.33 (2026 real AUD)

Reported / source value
$6.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh
8.79

Shown in table
$8.79 (2026 real AUD)

How this was derived
Benchmark heat rate from the 2024 AEMO/Aurecon reciprocating-engine review; used as proxy performance assumption.

Reference
2024 Energy Technology Cost and Technical Parameters Review (high confidence)
Source recorded 08 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Plant-specific greenfield capex could not be verified from owner/developer/government sources in available search results. Jacks Gully is an EDL landfill gas site with 2 MW capacity on EDL's project page, while the NEM register data referenced elsewhere indicates 2.3 MW for JACKSGUL; operating assumptions therefore use the AEMO/Aurecon reciprocating-engine landfill-gas benchmark as an estimated fallback. The benchmark is for a hypothetical 211.2 MW natural-gas reciprocating-engine plant, so it is only a proxy for O&M and performance, not reported project-specific capex.

Sources