ISIS Central Sugar Mill Co-generation Plant (ICSM)

Other Generators · SUSTAINABLE ENERGY INFRASTRUCTURE · Turbine - Steam Sub Critical

AEMO: removed QLD1 Other - Other NEM data · 24 hours
25 MW
Registered nameplate capacity
Est. SRMC
$24.28/MWh
Key information
Capacity
25 MW

AEMO status removed
Project status (AI)

Region QLD1
Coordinates

DUID ICSM
Owner SUSTAINABLE ENERGY INFRASTRUCTURE
Commissioned
Expected closure
Closure date
Technology Turbine - Steam Sub Critical
Fuel Other - Other
Equipment OEM
Equipment type / model
Stats window
13 Jun 2026 17:45 → 14 Jun 2026 17:45 AEST

Dispatch & revenue

13 Jun 2026 17:45 → 14 Jun 2026 17:45 AEST

No dispatch data for DUID ICSM in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
25 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$24.28/MWh
Capex total (greenfield)
$40.49M

Shown in table
$40.49M (2026 real AUD)

Reported / source value
$23.00M (2005 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is a direct reported project investment figure for the Isis Central Sugar Mill co-generation plant.

Reference
Hansard Wednesday, 23 March 2005 – Green Energy, Ergon Energy (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$1,619,718

Shown in table
$1.62M (2026 real AUD)

Reported / source value
$920.0k (2005 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MW capex was calculated from the reported total capex and the stated 25 MW capacity.

Reference
Hansard Wednesday, 23 March 2005 – Green Energy, Ergon Energy (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$8.10M

Shown in table
$8.10M (2026 real AUD)

Reported / source value
$4.60M (2005 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$324,093

Shown in table
$324.1k (2026 real AUD)

Reported / source value
$184.1k (2005 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as a proxy for a biomass/waste-style thermal plant because exact plant-specific O&M was not found.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$24.28

Shown in table
$24.28 (2026 real AUD)

Reported / source value
$13.79 (2005 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as a proxy O&M value for a biomass/waste-style thermal plant because exact plant-specific O&M was not found.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Greenfield plant investment reported by Queensland Hansard as Ergon Energy's $23 million Green Energy Power Plant at the Isis Central Sugar Mill near Childers, with construction commencing in April 2005. No plant-specific brownfield refurbishment cost found. O&M values were not found for this exact bagasse cogeneration plant, so a 2024 AEMO/Aurecon biomass/waste-style proxy was used only for O&M-related fallbacks; fuel cost, heat rate, and asset life remain unverified.

Sources