Other Generators · Haughton Sugar Company Pty Limited · Turbine - Steam Sub Critical
20 Jun 2026 23:25 → 21 Jun 2026 23:25 AEST
| Capex total (greenfield) |
$238.77M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,746,835
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$12.50M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$248,477
Shown in table Reported / source value |
| Variable OPEX / MWh |
$14.55
Shown in table Reported / source value |
| Fuel cost / GJ default |
$8.00
Shown in table |
| Heat rate GJ/MWh default |
14.00
Shown in table |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in official/owner/government sources during this search. I therefore did not assign reported capex. O&M values are taken from the 2024 AEMO/Aurecon Energy Technology Cost and Technical Parameter Review bioenergy assumptions; the report states biomass generation is mature and bagasse remains a significant source of renewable energy in Australia. Invicta Mill is described by Wilmar as having greater generation capacity within its fleet, but no public project cost for the original plant was located.