Hunter Power Station (HUNTER1)

Gas Peakers · Snowy Hydro Limited · Turbine - OCGT

Operational AEMO: Committed NSW1 Fossil - Natural Gas Pipeline NEM data · 24 hours
375 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$142.99/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
375 MW

AEMO status Committed
Project status Operational (AI)

Snowy Hydro project page indicates the Hunter Power Project was commissioned on 2025-08-01; Mitsubishi Power notes the site uses two M701F gas turbines.

Region NSW1
Coordinates -32.82200, 151.49400 (AI)

Snowy Hydro Hunter Power Project page identifies the site as Kurri Kurri (Hunter Power Project); approximate plant location inferred from project references to Kurri Kurri, NSW.

MLF 0.9692
DUID HUNTER1
Owner Snowy Hydro Limited
Commissioned Aug 2025
Expected closure 2064
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM Mitsubishi Heavy Industries
Turbine / engine model M701F
Equipment confidence high
Stats window
13 Jun 2026 06:10 → 14 Jun 2026 06:10 AEST

Dispatch & revenue

13 Jun 2026 06:10 → 14 Jun 2026 06:10 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9692
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2025-03-25 0.9767
2025-07-01 0.9692

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
375 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$142.99/MWh
Capex total (greenfield)
$1,037.12M

Shown in table
$1,037.12M (2026 real AUD)

Reported / source value
$950.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner announcement of revised total project cost.

Reference
Hunter Power Project Archives - Snowy Hydro (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$2,765,648

Shown in table
$2.77M (2026 real AUD)

Reported / source value
$2.53M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MW value calculated from reported total cost and requested 375 MW capacity.

Reference
Hunter Power Project Archives - Snowy Hydro (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$5.76M

Shown in table
$5.76M (2026 real AUD)

Reported / source value
$5.26M (2023 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$15,357

Shown in table
$15.4k (2026 real AUD)

Reported / source value
$14.1k (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as fallback fixed O&M for large gas turbine/OCGT analogue.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$15.05

Shown in table
$15.05 (2026 real AUD)

Reported / source value
$13.79 (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as fallback variable O&M for large gas turbine/OCGT analogue.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
$13.10

Shown in table
$13.10 (2026 real AUD)

Reported / source value
$12.00 (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh
9.77

Shown in table
$9.77 (2026 real AUD)

How this was derived
Used as best available large gas turbine heat-rate proxy.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Snowy Hydro’s Hunter Power Project is the operating name for Kurri Kurri Power Station. The project’s total target cost was reported as $950 million in Snowy Hydro’s August 2023 reset announcement. The Snowy Hydro project page describes two OCGTs and 660 MW supplied initially. AEMO 2024 technology review values were used only for O&M and performance fallback for a large GT/OCGT analogue, not for capex.