Hazelwood BESS (Ironwood) - KCI

BESS · International Power (Australia) Pty Ltd (trading as ENGIE) · Storage - Battery

AEMO: removed Other - Other NEM data · 24 hours
40 MW
Registered nameplate capacity
Est. SRMC
$1.87/MWh
Key information
Capacity
40 MW

AEMO status removed
Project status (AI)

DUID
Owner International Power (Australia) Pty Ltd (trading as ENGIE)
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
03 Jun 2026 22:40 → 04 Jun 2026 22:40 AEST

Dispatch & revenue

03 Jun 2026 22:40 → 04 Jun 2026 22:40 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
40 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.87/MWh
Capex total (greenfield)
$186.57M

Shown in table
$186.57M (2026 real AUD)

Reported / source value
$150.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official project page confirms the plant size, partners, and commissioning status; used to validate the battery project context.

Reference
Hazelwood Battery (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
$1.24M

Shown in table
$1.24M (2026 real AUD)

Reported / source value
$1.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$31,095

Shown in table
$31.1k (2026 real AUD)

Reported / source value
$25.0k (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$1.87

Shown in table
$1.87 (2026 real AUD)

Reported / source value
$1.50 (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Plant-specific greenfield capex was found in a 2021 project announcement: estimated cost of $150 million for the 150 MW/150 MWh Hazelwood Battery Energy Storage System, funded by ENGIE and Macquarie's Green Investment Group, with construction commencing in late 2021 and commissioning in 2023. The user-provided capacity for this DUID is 40 MW, but the source figure applies to the full Hazelwood battery project, not a 40 MW unit. No project-specific O&M was found; server-side default O&M was retained. The project is a battery storage asset with no fuel, heat rate, or emissions intensity in operation.

Sources