BESS · International Power (Australia) Pty Ltd (trading as ENGIE) · Storage - Battery
03 Jun 2026 22:40 → 04 Jun 2026 22:40 AEST
| Capex total (greenfield) |
$186.57M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$1.24M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$31,095
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.87
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Plant-specific greenfield capex was found in a 2021 project announcement: estimated cost of $150 million for the 150 MW/150 MWh Hazelwood Battery Energy Storage System, funded by ENGIE and Macquarie's Green Investment Group, with construction commencing in late 2021 and commissioning in 2023. The user-provided capacity for this DUID is 40 MW, but the source figure applies to the full Hazelwood battery project, not a 40 MW unit. No project-specific O&M was found; server-side default O&M was retained. The project is a battery storage asset with no fuel, heat rate, or emissions intensity in operation.