Grosvenor 2 Waste Coal Mine Gas Power Station (GROSV2)

Coal · EDL Projects Australia Pty Ltd · Reciprocating Engine - Spark ignition

AEMO: removed QLD1 Fossil - Coal Seam Methane NEM data · 9h
15 MW
Registered nameplate capacity
Est. SRMC
$14.55/MWh
Key information
Capacity
15 MW

AEMO status removed
Project status (AI)

Region QLD1
Coordinates

DUID GROSV2
Owner EDL Projects Australia Pty Ltd
Commissioned
Expected closure 2025
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Fossil - Coal Seam Methane
Equipment OEM
Equipment type / model
Stats window
15 Jun 2026 00:00 → 15 Jun 2026 09:20 AEST

Dispatch & revenue

15 Jun 2026 00:00 → 15 Jun 2026 09:20 AEST

No dispatch data for DUID GROSV2 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
15 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$14.55/MWh
Capex total (greenfield)
$32.09M

Shown in table
$32.09M (2026 real AUD)

Reported / source value
$30.42M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$2,109,705

Shown in table
$2.11M (2026 real AUD)

Reported / source value
$2.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh
$14.55

Shown in table
$14.55 (2026 real AUD)

Reported / source value
$13.79 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Grosvenor 2 is described by EDL as a 15 MW expansion at the Grosvenor site; EDL owns and operates Grosvenor 1 and 2. AEMO/Aurecon 2024 benchmark material indicates high-speed spark-ignition reciprocating engines fuelled by coal seam methane or waste gas typically have <50 MW installed capacity, but the report does not provide a plant-specific capex for Grosvenor 2. I therefore left capex fields null rather than infer from a benchmark. No verified source found for commissioned date beyond operation as an expansion in 2017.